Why am I overplanning?

I’m running this project, but for some reason I’m in a situation where I have to do an Upgrade Plan.
Currently, the number of integrations, etc. is not exceeded either, which makes me wonder

Should be fixed right now.

You’re on the open-source subscription, and it’s unlimited, but it still requires some limits in order to be saved in our database. Usually, open-source projects are small and the default limit is more than enough, so this situation is not the common one.

I’ve just increased the limit and refreshed the system. From my side, all looks fine now :slight_smile: